{"id":20856,"date":"2007-11-09T00:00:00","date_gmt":"2007-11-09T00:00:00","guid":{"rendered":"https:\/\/sando.com\/actualidad\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line"},"modified":"2024-10-29T10:37:27","modified_gmt":"2024-10-29T10:37:27","slug":"for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line","status":"publish","type":"post","link":"https:\/\/www.sando.com\/en\/actualidad\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line","title":{"rendered":"For the second time in a row, Sando beats the world record in daily advancing with the tunnelling machine in the work on the Madrid-Valencia AVE railway line"},"content":{"rendered":"<p>The company excavated 67.2 metres in one day in La Cabrera tunnel along the Siete Aguas-Bu\u00f1ol section<br \/>\nThe Sando Group team executing the Siete Aguas-Bu\u00f1ol section of the Madrid-Valencia line as part of a TBA, awarded by ADIF, has beaten the international world record in daily advancing with a tunnelling machine in just one day.  The manufacturer of the machine, Herrenknecht AG, congratulated the TBA executing the section for its magnificent work.<\/p>\n<p>The execution of La Cabrera <a href=\"\/en\/specialisations\/transport-infrastructure\/transport-and-mobility\/tunnels-and-mobility-structures\" title=\"Tunnels and subway constructions\" target=\"_blank\">Tunnels<\/a>, each with a length of 7.2 km, consists of perforating two parallel circular tunnels with a nominal excavation diameter of 9.72 m. The Sando team managed to beat the record of 65.6 metres achieved by the same TBA using the S-373 Unax tunnelling machine, by excavating 67.2 metres in one day.  This achievement is due to the improvements made during the test period by the team directing the tunnelling machine and Sando\u2019s experience in this type of infrastructure, and is proof of Sando\u2019s excellent technical capacity and avant-garde technology. The technical team responsible for directing the work and ADIF have cooperated with each other in achieving this important international milestone. <\/p>\n<p>The Siete Aguas-Bu\u00f1ol section is comprised of 11.2 kilometres in length and has different tunnels and viaducts along its course, but La Cabrera is the most complicated and important tunnel of all those being executed.  <\/p>\n<p>Sando is present in the main <a href=\"\/en\/specialisations\/transport-infrastructure\/passenger-transport\/railway\" title=\"Construction of railroad tracks\" target=\"_blank\">Railway<\/a> infrastructures of Spain, including different sections of the AVE line, for instance the Madrid-Segovia-Valladolid, Atlantic Line, Madrid-Valencia, Bobadilla-Granada or C\u00f3rdoba-M\u00e1laga lines. It is also involved in other important projects such as the new terminal for M\u00e1laga airport and the second runway, the desalination plant in Campo de Dal\u00edas, Almer\u00eda; different sections along the Levante or Castilla dual carriageways or El Ca\u00f1averal Residential Complex in Madrid, the largest in Spain.<br \/>\nThe Sando Group is currently expanding throughout Spain and Europe, and is one of the top ten construction firms in the country. In 2006 its turnover amounted to 759.5 million euros and forecasts for 2007 indicate a new increase in turnover, reaching some 1,000 million euros.<\/p>\n<p><a href=\"\" target=\"_blank\" rel=\"noopener noreferrer\" download=\"\">Download file<\/a><\/p>\n<p style=\"text-align: left;\">\n<p>&nbsp;<\/p>\n<div class=\"avia-button-wrap avia-button-center avia-builder-el-47 el_after_av_button avia-builder-el-last \"><a class=\"avia-button av-icon-on-hover avia-icon_select-yes-right-icon avia-color-custom avia-size-large avia-position-center \" style=\"background-color: #006918; border-color: #004576; color: #ffffff;\" href=\"..\/press-releases\/\"><span class=\"avia_iconbox_title\">Return to Press releases<\/span><\/a><\/div>\n","protected":false},"excerpt":{"rendered":"The company excavated 67.2 metres in one day in La Cabrera tunnel along the Siete Aguas-Bu\u00f1ol section","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1057,1334],"tags":[],"tax_brand":[],"tax_services":[],"tax_location":[],"class_list":["post-20856","post","type-post","status-publish","format-standard","hentry","category-communication_press-releases","category-press-releases-communication_press-releases"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>R\u00e9cord Mundial: Sando Avanza en AVE Madrid-Valencia<\/title>\n<meta name=\"description\" content=\"Sando logra un nuevo r\u00e9cord mundial de avance diario con tuneladora en el AVE Madrid-Valencia. Descubre los detalles de este hito.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.sando.com\/en\/actualidad\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"R\u00e9cord Mundial: Sando Avanza en AVE Madrid-Valencia\" \/>\n<meta property=\"og:description\" content=\"Sando logra un nuevo r\u00e9cord mundial de avance diario con tuneladora en el AVE Madrid-Valencia. Descubre los detalles de este hito.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.sando.com\/en\/actualidad\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line\" \/>\n<meta property=\"og:site_name\" content=\"Sando\" \/>\n<meta property=\"article:published_time\" content=\"2007-11-09T00:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-29T10:37:27+00:00\" \/>\n<meta name=\"author\" content=\"Juanje Juanje\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Juanje Juanje\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line\"},\"author\":{\"name\":\"Juanje Juanje\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#\\\/schema\\\/person\\\/632d5c2fe5027989411732e84a37e6c1\"},\"headline\":\"For the second time in a row, Sando beats the world record in daily advancing with the tunnelling machine in the work on the Madrid-Valencia AVE railway line\",\"datePublished\":\"2007-11-09T00:00:00+00:00\",\"dateModified\":\"2024-10-29T10:37:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line\"},\"wordCount\":381,\"publisher\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#organization\"},\"articleSection\":[\"Communication_Press releases\",\"Press releases (NOT)\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line\",\"url\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line\",\"name\":\"R\u00e9cord Mundial: Sando Avanza en AVE Madrid-Valencia\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#website\"},\"datePublished\":\"2007-11-09T00:00:00+00:00\",\"dateModified\":\"2024-10-29T10:37:27+00:00\",\"description\":\"Sando logra un nuevo r\u00e9cord mundial de avance diario con tuneladora en el AVE Madrid-Valencia. Descubre los detalles de este hito.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/www.sando.com\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"For the second time in a row, Sando beats the world record in daily advancing with the tunnelling machine in the work on the Madrid-Valencia AVE railway line\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#website\",\"url\":\"https:\\\/\\\/www.sando.com\\\/en\",\"name\":\"Sando\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.sando.com\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#organization\",\"name\":\"Sando\",\"url\":\"https:\\\/\\\/www.sando.com\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"\",\"contentUrl\":\"\",\"caption\":\"Sando\"},\"image\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#\\\/schema\\\/person\\\/632d5c2fe5027989411732e84a37e6c1\",\"name\":\"Juanje Juanje\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c3e6022bd9f917c76ed8e8b6871d1ffbb4e91e491e7ef61fe483473b62660729?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c3e6022bd9f917c76ed8e8b6871d1ffbb4e91e491e7ef61fe483473b62660729?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c3e6022bd9f917c76ed8e8b6871d1ffbb4e91e491e7ef61fe483473b62660729?s=96&d=mm&r=g\",\"caption\":\"Juanje Juanje\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"R\u00e9cord Mundial: Sando Avanza en AVE Madrid-Valencia","description":"Sando logra un nuevo r\u00e9cord mundial de avance diario con tuneladora en el AVE Madrid-Valencia. Descubre los detalles de este hito.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.sando.com\/en\/actualidad\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line","og_locale":"en_US","og_type":"article","og_title":"R\u00e9cord Mundial: Sando Avanza en AVE Madrid-Valencia","og_description":"Sando logra un nuevo r\u00e9cord mundial de avance diario con tuneladora en el AVE Madrid-Valencia. Descubre los detalles de este hito.","og_url":"https:\/\/www.sando.com\/en\/actualidad\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line","og_site_name":"Sando","article_published_time":"2007-11-09T00:00:00+00:00","article_modified_time":"2024-10-29T10:37:27+00:00","author":"Juanje Juanje","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Juanje Juanje","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.sando.com\/en\/actualidad\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line#article","isPartOf":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line"},"author":{"name":"Juanje Juanje","@id":"https:\/\/www.sando.com\/en#\/schema\/person\/632d5c2fe5027989411732e84a37e6c1"},"headline":"For the second time in a row, Sando beats the world record in daily advancing with the tunnelling machine in the work on the Madrid-Valencia AVE railway line","datePublished":"2007-11-09T00:00:00+00:00","dateModified":"2024-10-29T10:37:27+00:00","mainEntityOfPage":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line"},"wordCount":381,"publisher":{"@id":"https:\/\/www.sando.com\/en#organization"},"articleSection":["Communication_Press releases","Press releases (NOT)"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.sando.com\/en\/actualidad\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line","url":"https:\/\/www.sando.com\/en\/actualidad\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line","name":"R\u00e9cord Mundial: Sando Avanza en AVE Madrid-Valencia","isPartOf":{"@id":"https:\/\/www.sando.com\/en#website"},"datePublished":"2007-11-09T00:00:00+00:00","dateModified":"2024-10-29T10:37:27+00:00","description":"Sando logra un nuevo r\u00e9cord mundial de avance diario con tuneladora en el AVE Madrid-Valencia. Descubre los detalles de este hito.","breadcrumb":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.sando.com\/en\/actualidad\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.sando.com\/en\/actualidad\/for-the-second-time-in-a-row-sando-beats-the-world-record-in-daily-advancing-with-the-tunnelling-machine-in-the-work-on-the-madrid-valencia-ave-railway-line#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.sando.com\/en"},{"@type":"ListItem","position":2,"name":"For the second time in a row, Sando beats the world record in daily advancing with the tunnelling machine in the work on the Madrid-Valencia AVE railway line"}]},{"@type":"WebSite","@id":"https:\/\/www.sando.com\/en#website","url":"https:\/\/www.sando.com\/en","name":"Sando","description":"","publisher":{"@id":"https:\/\/www.sando.com\/en#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.sando.com\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.sando.com\/en#organization","name":"Sando","url":"https:\/\/www.sando.com\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sando.com\/en#\/schema\/logo\/image\/","url":"","contentUrl":"","caption":"Sando"},"image":{"@id":"https:\/\/www.sando.com\/en#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.sando.com\/en#\/schema\/person\/632d5c2fe5027989411732e84a37e6c1","name":"Juanje Juanje","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/c3e6022bd9f917c76ed8e8b6871d1ffbb4e91e491e7ef61fe483473b62660729?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c3e6022bd9f917c76ed8e8b6871d1ffbb4e91e491e7ef61fe483473b62660729?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c3e6022bd9f917c76ed8e8b6871d1ffbb4e91e491e7ef61fe483473b62660729?s=96&d=mm&r=g","caption":"Juanje Juanje"}}]}},"_links":{"self":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/posts\/20856","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/comments?post=20856"}],"version-history":[{"count":0,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/posts\/20856\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/media?parent=20856"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/categories?post=20856"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tags?post=20856"},{"taxonomy":"tax_brand","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tax_brand?post=20856"},{"taxonomy":"tax_services","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tax_services?post=20856"},{"taxonomy":"tax_location","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tax_location?post=20856"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}