{"id":21198,"date":"2018-04-24T00:00:00","date_gmt":"2018-04-24T00:00:00","guid":{"rendered":"https:\/\/sando.com\/actualidad\/gran-via-madrid-sando-works-station"},"modified":"2024-10-29T10:35:42","modified_gmt":"2024-10-29T10:35:42","slug":"gran-via-madrid-sando-works-station","status":"publish","type":"post","link":"https:\/\/www.sando.com\/en\/actualidad\/gran-via-madrid-sando-works-station","title":{"rendered":"Sando completes work on the Gran V\u00eda metro station"},"content":{"rendered":"<p>Sando has completed the refurbishment of the Gran V\u00eda metro station in Madrid. An intervention in which <a href=\"https:\/\/www.metromadrid.es\/es\" target=\"_blank\" rel=\"noopener noreferrer\">Metro de Madrid<\/a>, the <a href=\"https:\/\/www.comunidad.madrid\/\" target=\"_blank\" rel=\"noopener noreferrer\">Directorate General of Infrastructures of the Community of Madrid<\/a> and <a href=\"http:\/\/www.adif.es\/es_ES\/index.shtml\" target=\"_blank\" rel=\"noopener noreferrer\">Adif<\/a> took part.<\/p>\n<p>As indicated by the Community of Madrid, the new infrastructure is one of the most ambitious projects in the region. It is a major extension, improves accessibility and connects the Puerta del Sol axis (with Metro and Cercan\u00edas-Renfe) and Gran V\u00eda.<\/p>\n<p>The works carried out by Sando consisted of a complete extension of the existing station, which has a vertical axis connecting the different levels. On the first level, the lobby areas have been increased from 900 to 2000 square metres.<\/p>\n<p>On a second level, a museum has been set up with the archaeological remains found during the excavation and extension of the station. Finally, on a third level, it connects with line 5 and an access gallery that links the Gran V\u00eda Metro station with the Renfe Cercan\u00edas Sol station. Sando has also redeveloped the surrounding areas.<\/p>\n<p>The work carried out by Sando is the equivalent of an 8-storey underground building wedged between the buildings on the sides of Calle Montera. The construction company has used <a href=\"https:\/\/www.sando.com\/es\/sando-aplica-la-bim-la-estacion-metro-gran-via-madrid\/\" target=\"_blank\" rel=\"noopener\">BIM<\/a> (Building Information Modelling) technology to carry it out, thus adapting the project to reality efficiently and with greater safety and accuracy.<\/p>\n","protected":false},"excerpt":{"rendered":"Sando has completed the refurbishment of the Gran V\u00eda metro station in Madrid. An intervention in which Metro de Madrid, the Directorate General of Infrastructures of the Community of Madrid and Adif took part. As indicated by the Community of Madrid, the new infrastructure is one of the most ambitious projects in the region. It&#8230; <a class=\"view-article\" href=\"https:\/\/www.sando.com\/en\/reemplazos\/conacon-sando\">View Article<\/a>","protected":false},"author":2,"featured_media":2959,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[980,979],"tags":[1290,1051,1274,997,998],"tax_brand":[],"tax_services":[],"tax_location":[],"class_list":["post-21198","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-comunicacion-comunicacion-en","category-communication","tag-bim","tag-eficiencia","tag-ferroviaria","tag-infrastructures","tag-innovation"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Obras Metro Gran V\u00eda Madrid: Sando Avanza<\/title>\n<meta name=\"description\" content=\"Sando inicia las obras de la estaci\u00f3n de Metro de Gran V\u00eda en Madrid, un proyecto clave para mejorar la movilidad urbana y conectar la ciudad.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.sando.com\/en\/actualidad\/gran-via-madrid-sando-works-station\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Obras Metro Gran V\u00eda Madrid: Sando Avanza\" \/>\n<meta property=\"og:description\" content=\"Sando inicia las obras de la estaci\u00f3n de Metro de Gran V\u00eda en Madrid, un proyecto clave para mejorar la movilidad urbana y conectar la ciudad.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.sando.com\/en\/actualidad\/gran-via-madrid-sando-works-station\" \/>\n<meta property=\"og:site_name\" content=\"Sando\" \/>\n<meta property=\"article:published_time\" content=\"2018-04-24T00:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-29T10:35:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.sando.com\/contenido\/subidas\/2023\/06\/gran-via-sando-estacion-madrid.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Juanje Juanje\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Juanje Juanje\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/gran-via-madrid-sando-works-station#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/gran-via-madrid-sando-works-station\"},\"author\":{\"name\":\"Juanje Juanje\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#\\\/schema\\\/person\\\/632d5c2fe5027989411732e84a37e6c1\"},\"headline\":\"Sando completes work on the Gran V\u00eda metro station\",\"datePublished\":\"2018-04-24T00:00:00+00:00\",\"dateModified\":\"2024-10-29T10:35:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/gran-via-madrid-sando-works-station\"},\"wordCount\":235,\"publisher\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/gran-via-madrid-sando-works-station#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.sando.com\\\/contenido\\\/subidas\\\/2023\\\/06\\\/gran-via-sando-estacion-madrid.jpg\",\"keywords\":[\"bim\",\"eficiencia\",\"ferroviaria\",\"Infrastructures\",\"Innovation\"],\"articleSection\":[\"Blog-EN\",\"Communication\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/gran-via-madrid-sando-works-station\",\"url\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/gran-via-madrid-sando-works-station\",\"name\":\"Obras Metro Gran V\u00eda Madrid: Sando Avanza\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/gran-via-madrid-sando-works-station#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/gran-via-madrid-sando-works-station#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.sando.com\\\/contenido\\\/subidas\\\/2023\\\/06\\\/gran-via-sando-estacion-madrid.jpg\",\"datePublished\":\"2018-04-24T00:00:00+00:00\",\"dateModified\":\"2024-10-29T10:35:42+00:00\",\"description\":\"Sando inicia las obras de la estaci\u00f3n de Metro de Gran V\u00eda en Madrid, un proyecto clave para mejorar la movilidad urbana y conectar la ciudad.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/gran-via-madrid-sando-works-station#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/gran-via-madrid-sando-works-station\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/gran-via-madrid-sando-works-station#primaryimage\",\"url\":\"https:\\\/\\\/www.sando.com\\\/contenido\\\/subidas\\\/2023\\\/06\\\/gran-via-sando-estacion-madrid.jpg\",\"contentUrl\":\"https:\\\/\\\/www.sando.com\\\/contenido\\\/subidas\\\/2023\\\/06\\\/gran-via-sando-estacion-madrid.jpg\",\"width\":1200,\"height\":800},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/gran-via-madrid-sando-works-station#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/www.sando.com\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sando completes work on the Gran V\u00eda metro station\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#website\",\"url\":\"https:\\\/\\\/www.sando.com\\\/en\",\"name\":\"Sando\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.sando.com\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#organization\",\"name\":\"Sando\",\"url\":\"https:\\\/\\\/www.sando.com\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"\",\"contentUrl\":\"\",\"caption\":\"Sando\"},\"image\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#\\\/schema\\\/person\\\/632d5c2fe5027989411732e84a37e6c1\",\"name\":\"Juanje Juanje\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c3e6022bd9f917c76ed8e8b6871d1ffbb4e91e491e7ef61fe483473b62660729?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c3e6022bd9f917c76ed8e8b6871d1ffbb4e91e491e7ef61fe483473b62660729?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c3e6022bd9f917c76ed8e8b6871d1ffbb4e91e491e7ef61fe483473b62660729?s=96&d=mm&r=g\",\"caption\":\"Juanje Juanje\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Obras Metro Gran V\u00eda Madrid: Sando Avanza","description":"Sando inicia las obras de la estaci\u00f3n de Metro de Gran V\u00eda en Madrid, un proyecto clave para mejorar la movilidad urbana y conectar la ciudad.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.sando.com\/en\/actualidad\/gran-via-madrid-sando-works-station","og_locale":"en_US","og_type":"article","og_title":"Obras Metro Gran V\u00eda Madrid: Sando Avanza","og_description":"Sando inicia las obras de la estaci\u00f3n de Metro de Gran V\u00eda en Madrid, un proyecto clave para mejorar la movilidad urbana y conectar la ciudad.","og_url":"https:\/\/www.sando.com\/en\/actualidad\/gran-via-madrid-sando-works-station","og_site_name":"Sando","article_published_time":"2018-04-24T00:00:00+00:00","article_modified_time":"2024-10-29T10:35:42+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/www.sando.com\/contenido\/subidas\/2023\/06\/gran-via-sando-estacion-madrid.jpg","type":"image\/jpeg"}],"author":"Juanje Juanje","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Juanje Juanje","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.sando.com\/en\/actualidad\/gran-via-madrid-sando-works-station#article","isPartOf":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/gran-via-madrid-sando-works-station"},"author":{"name":"Juanje Juanje","@id":"https:\/\/www.sando.com\/en#\/schema\/person\/632d5c2fe5027989411732e84a37e6c1"},"headline":"Sando completes work on the Gran V\u00eda metro station","datePublished":"2018-04-24T00:00:00+00:00","dateModified":"2024-10-29T10:35:42+00:00","mainEntityOfPage":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/gran-via-madrid-sando-works-station"},"wordCount":235,"publisher":{"@id":"https:\/\/www.sando.com\/en#organization"},"image":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/gran-via-madrid-sando-works-station#primaryimage"},"thumbnailUrl":"https:\/\/www.sando.com\/contenido\/subidas\/2023\/06\/gran-via-sando-estacion-madrid.jpg","keywords":["bim","eficiencia","ferroviaria","Infrastructures","Innovation"],"articleSection":["Blog-EN","Communication"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.sando.com\/en\/actualidad\/gran-via-madrid-sando-works-station","url":"https:\/\/www.sando.com\/en\/actualidad\/gran-via-madrid-sando-works-station","name":"Obras Metro Gran V\u00eda Madrid: Sando Avanza","isPartOf":{"@id":"https:\/\/www.sando.com\/en#website"},"primaryImageOfPage":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/gran-via-madrid-sando-works-station#primaryimage"},"image":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/gran-via-madrid-sando-works-station#primaryimage"},"thumbnailUrl":"https:\/\/www.sando.com\/contenido\/subidas\/2023\/06\/gran-via-sando-estacion-madrid.jpg","datePublished":"2018-04-24T00:00:00+00:00","dateModified":"2024-10-29T10:35:42+00:00","description":"Sando inicia las obras de la estaci\u00f3n de Metro de Gran V\u00eda en Madrid, un proyecto clave para mejorar la movilidad urbana y conectar la ciudad.","breadcrumb":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/gran-via-madrid-sando-works-station#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.sando.com\/en\/actualidad\/gran-via-madrid-sando-works-station"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sando.com\/en\/actualidad\/gran-via-madrid-sando-works-station#primaryimage","url":"https:\/\/www.sando.com\/contenido\/subidas\/2023\/06\/gran-via-sando-estacion-madrid.jpg","contentUrl":"https:\/\/www.sando.com\/contenido\/subidas\/2023\/06\/gran-via-sando-estacion-madrid.jpg","width":1200,"height":800},{"@type":"BreadcrumbList","@id":"https:\/\/www.sando.com\/en\/actualidad\/gran-via-madrid-sando-works-station#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.sando.com\/en"},{"@type":"ListItem","position":2,"name":"Sando completes work on the Gran V\u00eda metro station"}]},{"@type":"WebSite","@id":"https:\/\/www.sando.com\/en#website","url":"https:\/\/www.sando.com\/en","name":"Sando","description":"","publisher":{"@id":"https:\/\/www.sando.com\/en#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.sando.com\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.sando.com\/en#organization","name":"Sando","url":"https:\/\/www.sando.com\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sando.com\/en#\/schema\/logo\/image\/","url":"","contentUrl":"","caption":"Sando"},"image":{"@id":"https:\/\/www.sando.com\/en#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.sando.com\/en#\/schema\/person\/632d5c2fe5027989411732e84a37e6c1","name":"Juanje Juanje","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/c3e6022bd9f917c76ed8e8b6871d1ffbb4e91e491e7ef61fe483473b62660729?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c3e6022bd9f917c76ed8e8b6871d1ffbb4e91e491e7ef61fe483473b62660729?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c3e6022bd9f917c76ed8e8b6871d1ffbb4e91e491e7ef61fe483473b62660729?s=96&d=mm&r=g","caption":"Juanje Juanje"}}]}},"_links":{"self":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/posts\/21198","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/comments?post=21198"}],"version-history":[{"count":0,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/posts\/21198\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/media\/2959"}],"wp:attachment":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/media?parent=21198"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/categories?post=21198"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tags?post=21198"},{"taxonomy":"tax_brand","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tax_brand?post=21198"},{"taxonomy":"tax_services","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tax_services?post=21198"},{"taxonomy":"tax_location","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tax_location?post=21198"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}