{"id":21263,"date":"2023-08-11T09:17:48","date_gmt":"2023-08-11T09:17:48","guid":{"rendered":"https:\/\/sando.com\/actualidad\/sando-executes-a-railway-work-for-the-ave-burgos-vitoria"},"modified":"2024-10-29T10:39:36","modified_gmt":"2024-10-29T10:39:36","slug":"sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava","status":"publish","type":"post","link":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava","title":{"rendered":"Sando Construcci\u00f3n carries out the railway works for the AVE Burgos-Vitoria high-speed train connection in Alava"},"content":{"rendered":"<p><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"><span class=\"NormalTextRun SCXW212303421 BCX0\">Sando <\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW212303421 BCX0\">Construcci\u00f3n<\/span><span class=\"NormalTextRun SCXW212303421 BCX0\"> is carrying out for<\/span>\u00a0<a href=\"https:\/\/www.adifaltavelocidad.es\/\" target=\"_blank\" rel=\"noopener\">ADIF AV<\/a> t<span class=\"TextRun SCXW1564707 BCX0\" lang=\"EN-GB\" xml_lang=\"EN-GB\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW1564707 BCX0\">he <a href=\"\/en\/specialisations\/transport-infrastructure\/passenger-transport\/railway\" title=\"Construction of railroad tracks\" target=\"_blank\">Railway<\/a> work for the platform of the Burgos-Vitoria High-Speed Line connection with the railway integration in the city of Vitoria-<\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW1564707 BCX0\">Gasteiz<\/span><span class=\"NormalTextRun SCXW1564707 BCX0\"> for more than 27.5 million euros.\u00a0<\/span><\/span><span class=\"EOP SCXW1564707 BCX0\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">These works are being carried out on a 3.6-kilometre stretch that runs through the municipalities of Iru\u00f1a de Oka to Vitoria-Gasteiz in the province of Alava. The starting point is east of the County of Villodas, in the Iru\u00f1a de Oka municipality, on the left bank of the Zadorra River.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The works allow the construction of a new platform that connects at the beginning with the last section of the Burgos-Vitoria corridor and, at the end of its route, with the integration section in the city of Vitoria-Gasteiz of the Madrid &#8211; Valladolid &#8211; Burgos &#8211; Vitoria &#8211; Bilbao\/San Sebasti\u00e1n-French border high-speed railway line.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">This new platform will have two unique structures: the first, to resolve the crossing between the Madrid-Hendaye conventional road and the high-speed line, is a 205 m long structure formed by a 30 m long viaduct at the entrance to a 115 m long pergola that forms the crossing at different levels, and a second 60 m long viaduct at the exit, and the second, to resolve the intersection with the A-4302 road as an overpass, is an 84 m long viaduct with three spans supported on two reinforced concrete piers and two abutments.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<h3><strong><span class=\"TextRun SCXW160630162 BCX0\" lang=\"EN-GB\" xml_lang=\"EN-GB\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW160630162 BCX0\">Specialisation in sustainable rail infrastructure<\/span><\/span><\/strong><\/h3>\n<p><span class=\"NormalTextRun SCXW210538417 BCX0\">Sando <\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW210538417 BCX0\">Construcci\u00f3n<\/span><span class=\"NormalTextRun SCXW210538417 BCX0\"> integrates <a href=\"\/en\/sustainability\" title=\"Sustainable and efficient environmental solutions\" target=\"_blank\">Sustainability<\/a> measures in <\/span><span class=\"NormalTextRun SCXW210538417 BCX0\">its projects<\/span><span class=\"NormalTextRun SCXW210538417 BCX0\"> through its specialised<\/span> <a href=\"https:\/\/www.sando.com\/en\/railways\/\" target=\"_blank\" rel=\"noopener\"><span class=\"TextRun SCXW210538417 BCX0\" lang=\"EN-GB\" xml_lang=\"EN-GB\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW210538417 BCX0\">railway infrastructures<\/span><\/span><\/a>, <span class=\"TextRun SCXW210538417 BCX0\" lang=\"EN-GB\" xml_lang=\"EN-GB\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW210538417 BCX0\">designing innovative and sustainable solutions for its clients.\u00a0<\/span><\/span><\/p>\n<p><span data-contrast=\"auto\">n the execution of this project, an Environmental Monitoring Plan and a <a href=\"https:\/\/www.sando.com\/en\/specialisations\/cleaning-and-waste-management\" title=\"Waste management\" target=\"_blank\">Waste<\/a> Management Plan will be carried out, which will estimate the production of construction and demolition waste, as well as the measures to guarantee its correct management. In this way, the project also contemplates restoration treatments for the environmental integration of the slopes, of the adapted transversal drainage works, such as wildlife crossings, and of the temporary occupation areas, such as auxiliary installations, stockpile areas, loans and landfills.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">With this project, <a href=\"\/en\/sando-construccion\" title=\"Sando Construcci\u00f3n. Building resilient and innovative infrastructures\" target=\"_blank\">Sando Construcci\u00f3n<\/a> continues to increase its experience and specialisation in railway works in line with its contribution to SDG 9 on Industry, Innovation and Infrastructure by facilitating the development of safe and accessible transport and promoting new electric mobility.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/span><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"Sando Construcci\u00f3n is carrying out for\u00a0ADIF AV the Railway work for the platform of the Burgos-Vitoria High-Speed Line connection with the railway integration in the city of Vitoria-Gasteiz for more than 27.5 million euros.\u00a0\u00a0 These works are being carried out on a 3.6-kilometre stretch that runs through the municipalities of Iru\u00f1a de Oka to Vitoria-Gasteiz&#8230; <a class=\"view-article\" href=\"https:\/\/www.sando.com\/en\/reemplazos\/conacon-sando\">View Article<\/a>","protected":false},"author":10,"featured_media":21662,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[980,979,1511,1720],"tags":[],"tax_brand":[],"tax_services":[],"tax_location":[],"class_list":["post-21263","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-comunicacion-comunicacion-en","category-communication","category-infrastructure","category-innovation"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Sando Construcci\u00f3n: AVE Burgos-Vitoria en \u00c1lava<\/title>\n<meta name=\"description\" content=\"Sando Construcci\u00f3n lidera la obra ferroviaria del AVE Burgos-Vitoria en \u00c1lava, garantizando calidad y eficiencia en cada etapa del proyecto.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sando Construcci\u00f3n: AVE Burgos-Vitoria en \u00c1lava\" \/>\n<meta property=\"og:description\" content=\"Sando Construcci\u00f3n lidera la obra ferroviaria del AVE Burgos-Vitoria en \u00c1lava, garantizando calidad y eficiencia en cada etapa del proyecto.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava\" \/>\n<meta property=\"og:site_name\" content=\"Sando\" \/>\n<meta property=\"article:published_time\" content=\"2023-08-11T09:17:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-29T10:39:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.sando.com\/contenido\/subidas\/2023\/08\/Obra-ferroviaria-AVE-Burgos-Vitoria.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"comunicacion\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"comunicacion\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava\"},\"author\":{\"name\":\"comunicacion\",\"@id\":\"https:\/\/www.sando.com\/en#\/schema\/person\/0b86ea22efc494c31456ec41062e4494\"},\"headline\":\"Sando Construcci\u00f3n carries out the railway works for the AVE Burgos-Vitoria high-speed train connection in Alava\",\"datePublished\":\"2023-08-11T09:17:48+00:00\",\"dateModified\":\"2024-10-29T10:39:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava\"},\"wordCount\":400,\"publisher\":{\"@id\":\"https:\/\/www.sando.com\/en#organization\"},\"image\":{\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.sando.com\/contenido\/subidas\/2023\/08\/Obra-ferroviaria-AVE-Burgos-Vitoria.jpg\",\"articleSection\":[\"Blog-EN\",\"Communication\",\"Infrastructure\",\"innovation\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava\",\"url\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava\",\"name\":\"Sando Construcci\u00f3n: AVE Burgos-Vitoria en \u00c1lava\",\"isPartOf\":{\"@id\":\"https:\/\/www.sando.com\/en#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.sando.com\/contenido\/subidas\/2023\/08\/Obra-ferroviaria-AVE-Burgos-Vitoria.jpg\",\"datePublished\":\"2023-08-11T09:17:48+00:00\",\"dateModified\":\"2024-10-29T10:39:36+00:00\",\"description\":\"Sando Construcci\u00f3n lidera la obra ferroviaria del AVE Burgos-Vitoria en \u00c1lava, garantizando calidad y eficiencia en cada etapa del proyecto.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava#primaryimage\",\"url\":\"https:\/\/www.sando.com\/contenido\/subidas\/2023\/08\/Obra-ferroviaria-AVE-Burgos-Vitoria.jpg\",\"contentUrl\":\"https:\/\/www.sando.com\/contenido\/subidas\/2023\/08\/Obra-ferroviaria-AVE-Burgos-Vitoria.jpg\",\"width\":1200,\"height\":800,\"caption\":\"Sando Construcci\u00f3n realiza una obra ferroviaria para ADIF AV para la conexi\u00f3n de la l\u00ednea Burgos-Vitoria por m\u00e1s de 27,5 millones de euros.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/www.sando.com\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sando Construcci\u00f3n carries out the railway works for the AVE Burgos-Vitoria high-speed train connection in Alava\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.sando.com\/en#website\",\"url\":\"https:\/\/www.sando.com\/en\",\"name\":\"Sando\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.sando.com\/en#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.sando.com\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.sando.com\/en#organization\",\"name\":\"Sando\",\"url\":\"https:\/\/www.sando.com\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.sando.com\/en#\/schema\/logo\/image\/\",\"url\":\"\",\"contentUrl\":\"\",\"caption\":\"Sando\"},\"image\":{\"@id\":\"https:\/\/www.sando.com\/en#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.sando.com\/en#\/schema\/person\/0b86ea22efc494c31456ec41062e4494\",\"name\":\"comunicacion\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.sando.com\/en#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/6f5b529334b3e339acaa13871e661b7245eccc61793c76b1f30a540d50deab4e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/6f5b529334b3e339acaa13871e661b7245eccc61793c76b1f30a540d50deab4e?s=96&d=mm&r=g\",\"caption\":\"comunicacion\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Sando Construcci\u00f3n: AVE Burgos-Vitoria en \u00c1lava","description":"Sando Construcci\u00f3n lidera la obra ferroviaria del AVE Burgos-Vitoria en \u00c1lava, garantizando calidad y eficiencia en cada etapa del proyecto.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava","og_locale":"en_US","og_type":"article","og_title":"Sando Construcci\u00f3n: AVE Burgos-Vitoria en \u00c1lava","og_description":"Sando Construcci\u00f3n lidera la obra ferroviaria del AVE Burgos-Vitoria en \u00c1lava, garantizando calidad y eficiencia en cada etapa del proyecto.","og_url":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava","og_site_name":"Sando","article_published_time":"2023-08-11T09:17:48+00:00","article_modified_time":"2024-10-29T10:39:36+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/www.sando.com\/contenido\/subidas\/2023\/08\/Obra-ferroviaria-AVE-Burgos-Vitoria.jpg","type":"image\/jpeg"}],"author":"comunicacion","twitter_card":"summary_large_image","twitter_misc":{"Written by":"comunicacion","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava#article","isPartOf":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava"},"author":{"name":"comunicacion","@id":"https:\/\/www.sando.com\/en#\/schema\/person\/0b86ea22efc494c31456ec41062e4494"},"headline":"Sando Construcci\u00f3n carries out the railway works for the AVE Burgos-Vitoria high-speed train connection in Alava","datePublished":"2023-08-11T09:17:48+00:00","dateModified":"2024-10-29T10:39:36+00:00","mainEntityOfPage":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava"},"wordCount":400,"publisher":{"@id":"https:\/\/www.sando.com\/en#organization"},"image":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava#primaryimage"},"thumbnailUrl":"https:\/\/www.sando.com\/contenido\/subidas\/2023\/08\/Obra-ferroviaria-AVE-Burgos-Vitoria.jpg","articleSection":["Blog-EN","Communication","Infrastructure","innovation"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava","url":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava","name":"Sando Construcci\u00f3n: AVE Burgos-Vitoria en \u00c1lava","isPartOf":{"@id":"https:\/\/www.sando.com\/en#website"},"primaryImageOfPage":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava#primaryimage"},"image":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava#primaryimage"},"thumbnailUrl":"https:\/\/www.sando.com\/contenido\/subidas\/2023\/08\/Obra-ferroviaria-AVE-Burgos-Vitoria.jpg","datePublished":"2023-08-11T09:17:48+00:00","dateModified":"2024-10-29T10:39:36+00:00","description":"Sando Construcci\u00f3n lidera la obra ferroviaria del AVE Burgos-Vitoria en \u00c1lava, garantizando calidad y eficiencia en cada etapa del proyecto.","breadcrumb":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava#primaryimage","url":"https:\/\/www.sando.com\/contenido\/subidas\/2023\/08\/Obra-ferroviaria-AVE-Burgos-Vitoria.jpg","contentUrl":"https:\/\/www.sando.com\/contenido\/subidas\/2023\/08\/Obra-ferroviaria-AVE-Burgos-Vitoria.jpg","width":1200,"height":800,"caption":"Sando Construcci\u00f3n realiza una obra ferroviaria para ADIF AV para la conexi\u00f3n de la l\u00ednea Burgos-Vitoria por m\u00e1s de 27,5 millones de euros."},{"@type":"BreadcrumbList","@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-carries-out-the-railway-works-for-the-ave-burgos-vitoria-high-speed-train-connection-in-alava#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.sando.com\/en"},{"@type":"ListItem","position":2,"name":"Sando Construcci\u00f3n carries out the railway works for the AVE Burgos-Vitoria high-speed train connection in Alava"}]},{"@type":"WebSite","@id":"https:\/\/www.sando.com\/en#website","url":"https:\/\/www.sando.com\/en","name":"Sando","description":"","publisher":{"@id":"https:\/\/www.sando.com\/en#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.sando.com\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.sando.com\/en#organization","name":"Sando","url":"https:\/\/www.sando.com\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sando.com\/en#\/schema\/logo\/image\/","url":"","contentUrl":"","caption":"Sando"},"image":{"@id":"https:\/\/www.sando.com\/en#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.sando.com\/en#\/schema\/person\/0b86ea22efc494c31456ec41062e4494","name":"comunicacion","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sando.com\/en#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/6f5b529334b3e339acaa13871e661b7245eccc61793c76b1f30a540d50deab4e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6f5b529334b3e339acaa13871e661b7245eccc61793c76b1f30a540d50deab4e?s=96&d=mm&r=g","caption":"comunicacion"}}]}},"_links":{"self":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/posts\/21263","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/comments?post=21263"}],"version-history":[{"count":0,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/posts\/21263\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/media\/21662"}],"wp:attachment":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/media?parent=21263"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/categories?post=21263"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tags?post=21263"},{"taxonomy":"tax_brand","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tax_brand?post=21263"},{"taxonomy":"tax_services","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tax_services?post=21263"},{"taxonomy":"tax_location","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tax_location?post=21263"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}