{"id":45322,"date":"2025-01-14T11:22:18","date_gmt":"2025-01-14T11:22:18","guid":{"rendered":"https:\/\/www.sando.com\/actualidad\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway"},"modified":"2025-01-17T12:27:16","modified_gmt":"2025-01-17T12:27:16","slug":"sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway","status":"publish","type":"post","link":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway","title":{"rendered":"Sando Construcci\u00f3n begins work on the construction of the BUS-VAO access lane to Malaga on the Guadalhorce motorway"},"content":{"rendered":"\n<p>This week, <a href=\"\/en\/sando-construccion\" title=\"Sando Construcci\u00f3n. Building resilient and innovative infrastructures\" target=\"_blank\">Sando Construcci\u00f3n<\/a> started work on the BUS-VAO lane access to Malaga on the Guadalhorce motorway (A-357). A project of the <a href=\"https:\/\/www.juntadeandalucia.es\/organismos\/fomentoarticulaciondelterritorioyvivienda.html\" target=\"_blank\" rel=\"noreferrer noopener\">Consejer\u00eda de Fomento, Articulaci\u00f3n del Territorio y Vivienda de la Junta de Andaluc\u00eda<\/a> (Ministry of Development, Territorial Planning and Housing of the Andalusian Regional Government) with an investment of 8.5 million euros. <\/p>\n\n<p>As indicated by the Regional Ministry itself, the works on the BUS-VAO lane accessing Malaga on the A-357 will allow the creation of a third lane for buses and high-occupancy vehicles in the direction of the capital.<\/p>\n\n<p>This sustainable action aims to encourage public transport and reduce traffic jams at one of the busiest points in the city. Access to Malaga via the Guadalhorce motorway reaches 74,000 vehicles per day. <\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Implementation of the BUS-VAO lane<\/strong><\/h3>\n\n<p>The works to be carried out by Sando Construcci\u00f3n, will allow for building a BUS-VAO platform covering 2.3 kilometres, specifically between the roundabout at the access to the Hospital Cl\u00ednico and the University to its extension at the entrance to the city before the intersection with Avenida Juan XXIII. <\/p>\n\n<p>The implementation of the BUS-VAO lane to widen a third lane will be carried out mainly inwards, occupying the median. The project also envisages increasing the overpass over the roundabout next to Doctor Manuel Dom\u00ednguez and Mar\u00eda Zambrano Avenues, occupying the space between carriageways, as will be done with the three overpasses at the junction with the MA-20. <\/p>\n\n<p>Finally, in the overpass over Calle Almog\u00eda, Sando Construcci\u00f3n will extend one side of the overpass by means of a new deck connected to the cantilever of the existing one.<\/p>\n\n<p>To ensure that the planned works have the least possible impact on traffic, Sando Construcci\u00f3n will carry out most of the work at night. In addition, it will be in constant communication with <a href=\"https:\/\/www.malaga.eu\/\" target=\"_blank\" rel=\"noreferrer noopener\">Malaga City Council<\/a>, the <a href=\"https:\/\/www.juntadeandalucia.es\/organismos\/fomentoarticulaciondelterritorioyvivienda.html\" target=\"_blank\" rel=\"noreferrer noopener\">Andalusian Regional Government<\/a>, and the <a href=\"https:\/\/www.dgt.es\/inicio\/\" target=\"_blank\" rel=\"noreferrer noopener\">Directorate General for Traffic<\/a> to coordinate the work. <\/p>\n\n<p>By building the BUS-VAO lane, Sando Construcci\u00f3n contributes to the <a href=\"https:\/\/www.sando.com\/en\/sustainability\/sdgs-sustainable-development-challenges\" target=\"_blank\" rel=\"noreferrer noopener\">Sustainable Development Goals<\/a>, specifically SDG 11, Sustainable Cities and Communities, and SDG 13, Climate Action.<\/p>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"This week, Sando Construcci\u00f3n started work on the BUS-VAO lane access to Malaga on the Guadalhorce motorway (A-357). A project of the Consejer\u00eda de Fomento, Articulaci\u00f3n del Territorio y Vivienda de la Junta de Andaluc\u00eda (Ministry of Development, Territorial Planning and Housing of the Andalusian Regional Government) with an investment of 8.5 million euros. As&#8230; <a class=\"view-article\" href=\"https:\/\/www.sando.com\/en\/reemplazos\/conacon-sando\">View Article<\/a>","protected":false},"author":6,"featured_media":45151,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[980,979,1],"tags":[1513,1800,1790,1509,1788,1789],"tax_brand":[1765],"tax_services":[],"tax_location":[],"class_list":["post-45322","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-comunicacion-comunicacion-en","category-communication","category-sin-categorizar","tag-construction","tag-eficiencia-en-2","tag-buenas-practicas-en-2","tag-infrastructure","tag-roads","tag-sustainable-mobility","tax_brand-sando-construccion-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Sando Construcci\u00f3n builds the BUS-VAO access lane to M\u00e1laga<\/title>\n<meta name=\"description\" content=\"Sando Construcci\u00f3n has started work on the BUS-VAO access lane to M\u00e1laga on the Guadalhorce motorway (A-357).\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sando Construcci\u00f3n builds the BUS-VAO access lane to M\u00e1laga\" \/>\n<meta property=\"og:description\" content=\"Sando Construcci\u00f3n has started work on the BUS-VAO access lane to M\u00e1laga on the Guadalhorce motorway (A-357).\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway\" \/>\n<meta property=\"og:site_name\" content=\"Sando\" \/>\n<meta property=\"article:published_time\" content=\"2025-01-14T11:22:18+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-01-17T12:27:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.sando.com\/contenido\/subidas\/2025\/01\/carril-bus-vao-a357.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"799\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ignacio Miranda\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ignacio Miranda\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway\"},\"author\":{\"name\":\"Ignacio Miranda\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#\\\/schema\\\/person\\\/de9e7d8314e1c13302097b9d7abd6f62\"},\"headline\":\"Sando Construcci\u00f3n begins work on the construction of the BUS-VAO access lane to Malaga on the Guadalhorce motorway\",\"datePublished\":\"2025-01-14T11:22:18+00:00\",\"dateModified\":\"2025-01-17T12:27:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway\"},\"wordCount\":367,\"publisher\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.sando.com\\\/contenido\\\/subidas\\\/2025\\\/01\\\/carril-bus-vao-a357.jpg\",\"keywords\":[\"Construction\",\"efficiency\",\"good practices\",\"Infrastructure\",\"roads\",\"sustainable mobility\"],\"articleSection\":[\"Blog-EN\",\"Communication\",\"Uncategorised\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway\",\"url\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway\",\"name\":\"Sando Construcci\u00f3n builds the BUS-VAO access lane to M\u00e1laga\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.sando.com\\\/contenido\\\/subidas\\\/2025\\\/01\\\/carril-bus-vao-a357.jpg\",\"datePublished\":\"2025-01-14T11:22:18+00:00\",\"dateModified\":\"2025-01-17T12:27:16+00:00\",\"description\":\"Sando Construcci\u00f3n has started work on the BUS-VAO access lane to M\u00e1laga on the Guadalhorce motorway (A-357).\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway#primaryimage\",\"url\":\"https:\\\/\\\/www.sando.com\\\/contenido\\\/subidas\\\/2025\\\/01\\\/carril-bus-vao-a357.jpg\",\"contentUrl\":\"https:\\\/\\\/www.sando.com\\\/contenido\\\/subidas\\\/2025\\\/01\\\/carril-bus-vao-a357.jpg\",\"width\":1200,\"height\":799,\"caption\":\"vEsta semana Sando Construcci\u00f3n ha iniciado las obras del carril BUS-VAO de acceso a M\u00e1laga por la autov\u00eda del Guadalhorce (A-357). Un proyecto de la Consejer\u00eda de Fomento, Articulaci\u00f3n del Territorio y Vivienda de la Junta de Andaluc\u00eda con una inversi\u00f3n de 8,5 millones de euros.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en\\\/actualidad\\\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/www.sando.com\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sando Construcci\u00f3n begins work on the construction of the BUS-VAO access lane to Malaga on the Guadalhorce motorway\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#website\",\"url\":\"https:\\\/\\\/www.sando.com\\\/en\",\"name\":\"Sando\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.sando.com\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#organization\",\"name\":\"Sando\",\"url\":\"https:\\\/\\\/www.sando.com\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"\",\"contentUrl\":\"\",\"caption\":\"Sando\"},\"image\":{\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.sando.com\\\/en#\\\/schema\\\/person\\\/de9e7d8314e1c13302097b9d7abd6f62\",\"name\":\"Ignacio Miranda\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/70b7487f1d3f0535f36d3ce7bc97e9729e4efb96033c2bb2f37aa99d6026879b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/70b7487f1d3f0535f36d3ce7bc97e9729e4efb96033c2bb2f37aa99d6026879b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/70b7487f1d3f0535f36d3ce7bc97e9729e4efb96033c2bb2f37aa99d6026879b?s=96&d=mm&r=g\",\"caption\":\"Ignacio Miranda\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Sando Construcci\u00f3n builds the BUS-VAO access lane to M\u00e1laga","description":"Sando Construcci\u00f3n has started work on the BUS-VAO access lane to M\u00e1laga on the Guadalhorce motorway (A-357).","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway","og_locale":"en_US","og_type":"article","og_title":"Sando Construcci\u00f3n builds the BUS-VAO access lane to M\u00e1laga","og_description":"Sando Construcci\u00f3n has started work on the BUS-VAO access lane to M\u00e1laga on the Guadalhorce motorway (A-357).","og_url":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway","og_site_name":"Sando","article_published_time":"2025-01-14T11:22:18+00:00","article_modified_time":"2025-01-17T12:27:16+00:00","og_image":[{"width":1200,"height":799,"url":"https:\/\/www.sando.com\/contenido\/subidas\/2025\/01\/carril-bus-vao-a357.jpg","type":"image\/jpeg"}],"author":"Ignacio Miranda","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Ignacio Miranda","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway#article","isPartOf":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway"},"author":{"name":"Ignacio Miranda","@id":"https:\/\/www.sando.com\/en#\/schema\/person\/de9e7d8314e1c13302097b9d7abd6f62"},"headline":"Sando Construcci\u00f3n begins work on the construction of the BUS-VAO access lane to Malaga on the Guadalhorce motorway","datePublished":"2025-01-14T11:22:18+00:00","dateModified":"2025-01-17T12:27:16+00:00","mainEntityOfPage":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway"},"wordCount":367,"publisher":{"@id":"https:\/\/www.sando.com\/en#organization"},"image":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway#primaryimage"},"thumbnailUrl":"https:\/\/www.sando.com\/contenido\/subidas\/2025\/01\/carril-bus-vao-a357.jpg","keywords":["Construction","efficiency","good practices","Infrastructure","roads","sustainable mobility"],"articleSection":["Blog-EN","Communication","Uncategorised"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway","url":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway","name":"Sando Construcci\u00f3n builds the BUS-VAO access lane to M\u00e1laga","isPartOf":{"@id":"https:\/\/www.sando.com\/en#website"},"primaryImageOfPage":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway#primaryimage"},"image":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway#primaryimage"},"thumbnailUrl":"https:\/\/www.sando.com\/contenido\/subidas\/2025\/01\/carril-bus-vao-a357.jpg","datePublished":"2025-01-14T11:22:18+00:00","dateModified":"2025-01-17T12:27:16+00:00","description":"Sando Construcci\u00f3n has started work on the BUS-VAO access lane to M\u00e1laga on the Guadalhorce motorway (A-357).","breadcrumb":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway#primaryimage","url":"https:\/\/www.sando.com\/contenido\/subidas\/2025\/01\/carril-bus-vao-a357.jpg","contentUrl":"https:\/\/www.sando.com\/contenido\/subidas\/2025\/01\/carril-bus-vao-a357.jpg","width":1200,"height":799,"caption":"vEsta semana Sando Construcci\u00f3n ha iniciado las obras del carril BUS-VAO de acceso a M\u00e1laga por la autov\u00eda del Guadalhorce (A-357). Un proyecto de la Consejer\u00eda de Fomento, Articulaci\u00f3n del Territorio y Vivienda de la Junta de Andaluc\u00eda con una inversi\u00f3n de 8,5 millones de euros."},{"@type":"BreadcrumbList","@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-begins-work-on-the-construction-of-the-bus-vao-access-lane-to-malaga-on-the-guadalhorce-motorway#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.sando.com\/en"},{"@type":"ListItem","position":2,"name":"Sando Construcci\u00f3n begins work on the construction of the BUS-VAO access lane to Malaga on the Guadalhorce motorway"}]},{"@type":"WebSite","@id":"https:\/\/www.sando.com\/en#website","url":"https:\/\/www.sando.com\/en","name":"Sando","description":"","publisher":{"@id":"https:\/\/www.sando.com\/en#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.sando.com\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.sando.com\/en#organization","name":"Sando","url":"https:\/\/www.sando.com\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sando.com\/en#\/schema\/logo\/image\/","url":"","contentUrl":"","caption":"Sando"},"image":{"@id":"https:\/\/www.sando.com\/en#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.sando.com\/en#\/schema\/person\/de9e7d8314e1c13302097b9d7abd6f62","name":"Ignacio Miranda","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/70b7487f1d3f0535f36d3ce7bc97e9729e4efb96033c2bb2f37aa99d6026879b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/70b7487f1d3f0535f36d3ce7bc97e9729e4efb96033c2bb2f37aa99d6026879b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/70b7487f1d3f0535f36d3ce7bc97e9729e4efb96033c2bb2f37aa99d6026879b?s=96&d=mm&r=g","caption":"Ignacio Miranda"}}]}},"_links":{"self":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/posts\/45322","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/comments?post=45322"}],"version-history":[{"count":0,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/posts\/45322\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/media\/45151"}],"wp:attachment":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/media?parent=45322"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/categories?post=45322"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tags?post=45322"},{"taxonomy":"tax_brand","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tax_brand?post=45322"},{"taxonomy":"tax_services","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tax_services?post=45322"},{"taxonomy":"tax_location","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tax_location?post=45322"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}