{"id":49748,"date":"2025-03-21T12:16:24","date_gmt":"2025-03-21T12:16:24","guid":{"rendered":"https:\/\/www.sando.com\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito"},"modified":"2025-05-02T10:35:53","modified_gmt":"2025-05-02T10:35:53","slug":"sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito","status":"publish","type":"post","link":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito","title":{"rendered":"Sando Construcci\u00f3n undertakes sanitation and wastewater treatment works in Villanueva de la Serena and Don Benito"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><em>The project includes the construction of six stormwater tanks with a total capacity of 22,800 m<sup>3<\/sup><\/em><\/h2>\n\n<p><a href=\"\/en\/sando-construccion\" title=\"Sando Construcci\u00f3n. Building resilient and innovative infrastructures\" target=\"_blank\">Sando Construcci\u00f3n<\/a>, in a joint venture (UTE), is carrying out the wastewater and stormwater management works for the towns of Villanueva de la Serena and Don Benito, commissioned by <a href=\"https:\/\/www.miteco.gob.es\/es.html\" target=\"_blank\" rel=\"noreferrer noopener\">Spain\u2019s Ministry for the Ecological Transition and the Demographic Challenge<\/a>. The \u20ac66 million project includes the construction of a new WWTP (Wastewater Treatment Plant), six stormwater tanks, and an 18-kilometre pipe network. <\/p>\n\n<p>According to the<a href=\"https:\/\/www.chguadiana.es\/\"> Guadiana River Basin Authority<\/a>, this project aims to address the current deficiencies in the sanitation and wastewater treatment systems in both towns. The new WWTP will feature state-of-the-art electromechanical equipment, new flow regulation structures, and upgraded outfalls and collectors with higher capacity. <\/p>\n\n<p>The project involves collecting wastewater from the urban centres and industrial zones of both municipalities. Regulation structures will manage flows via six stormwater tanks, which will be strategically located throughout the system and offer a combined capacity of 22,800 m<sup>\u00b3<\/sup>. A regulation basin will control rainfall overflow. <\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Innovation and expertise in the integrated water cycle<\/strong><\/h3>\n\n<p>Sando Construcci\u00f3n is executing this infrastructure with the support of <a href=\"\/en\/sando-agua\" title=\"Sando Agua. Building resilient and innovative infrastructures.\" target=\"_blank\">Sando Agua<\/a>, the company\u2019s specialist in innovation within the integrated water cycle. The new WWTP is designed to treat wastewater for a population equivalent of 79,634 inhabitants. It will process an average flow of 1,115 m\u00b3\/h, peak flows of up to 1,928 m\u00b3\/h, and a maximum pre-treatment flow of 4,459 m\u00b3\/h. <\/p>\n\n<p>The project encompasses works for the arrival, pretreatment, and coarse solids removal; screening, grit removal, degreasing, and primary sedimentation; the construction of a biological reactor, carousel-type with prolonged aeration and nutrient reduction; secondary sedimentation; and tertiary treatment, including physicochemical treatment, screening, and disinfection.<\/p>\n\n<p>Sando Construction will implement actions related to sludge management, including primary and biological sludge thickening, sludge heating and anaerobic digestion, and sludge conditioning and dewatering. Additionally, deodorisation will be carried out through odour treatment using <em>bio trickling<\/em> or biofiltration. <\/p>\n\n<p>Lastly, in line with circular economy principles and the use of renewable energy, the company will construct a gas line with a gasometer, boiler, flare, and cogeneration, along with a 1,319 kW photovoltaic solar plant.<\/p>\n\n<p>The wastewater collection system includes a robust 18-kilometre network of pipelines and auxiliary infrastructure to channel effluent to the new WWTP. This includes:<br\/>&#8211; 13 km of reinforced concrete piping with elastic joints<br\/>&#8211; 1.2 km of pipe jacking under <a href=\"\/en\/specialisations\/transport-infrastructure\/transport-and-mobility\/roads\" title=\"We build and renovate highways, freeways and roads\" target=\"_blank\">Roads<\/a>, canals, and <a href=\"\/en\/specialisations\/transport-infrastructure\/passenger-transport\/railway\" title=\"Construction of railroad tracks\" target=\"_blank\">Railway<\/a> lines<br\/>&#8211; 1.2 km of concrete galleries constructed using prefabricated reinforced frames<br\/>&#8211; A 2.6 km microtunnel, 1,200 mm in diameter, excavated using a closed shield with wet soil extraction technology  <\/p>\n\n<p>This ambitious infrastructure project is fully aligned with Sando\u2019s ESG (Environmental, Social and Governance) strategy and its commitment to sustainable urban development. It contributes directly to several UN Sustainable Development Goals (SDGs):<br\/>\u00b7 SDG 6: Clean Water and Sanitation<br\/>\u00b7 SDG 9: Industry, Innovation and Infrastructure<br\/>\u00b7 SDG 7: Affordable and Clean Energy  <\/p>\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-1-700x466.jpg\" alt=\"\" class=\"wp-image-47931\" style=\"width:467px;height:auto\" srcset=\"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-1-700x466.jpg 700w, https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-1-250x166.jpg 250w, https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-1-768x511.jpg 768w, https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-1-120x80.jpg 120w, https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-1.jpg 1202w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/figure>\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"700\" height=\"420\" src=\"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-3-copia-700x420.jpg\" alt=\"\" class=\"wp-image-47935\" style=\"width:468px;height:auto\" srcset=\"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-3-copia-700x420.jpg 700w, https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-3-copia-250x150.jpg 250w, https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-3-copia-768x461.jpg 768w, https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-3-copia-1536x922.jpg 1536w, https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-3-copia-120x72.jpg 120w, https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-3-copia.jpg 2000w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/figure>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"The project includes the construction of six stormwater tanks with a total capacity of 22,800 m3 Sando Construcci\u00f3n, in a joint venture (UTE), is carrying out the wastewater and stormwater management works for the towns of Villanueva de la Serena and Don Benito, commissioned by Spain\u2019s Ministry for the Ecological Transition and the Demographic Challenge&#8230;. <a class=\"view-article\" href=\"https:\/\/www.sando.com\/en\/reemplazos\/conacon-sando\">View Article<\/a>","protected":false},"author":6,"featured_media":47934,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[980,979,1],"tags":[1854,1800,1855,1509,1537,1798,1530],"tax_brand":[1764,1765],"tax_services":[],"tax_location":[],"class_list":["post-49748","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-comunicacion-comunicacion-en","category-communication","category-sin-categorizar","tag-edar-en","tag-eficiencia-en-2","tag-hydraulics","tag-infrastructure","tag-innovation-en","tag-sostenibilidad-en-2","tag-water","tax_brand-sando-agua","tax_brand-sando-construccion-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Sando executes the sewerage and wastewater treatment project in Don Benito<\/title>\n<meta name=\"description\" content=\"Sando Construcci\u00f3n undertakes sanitation and wastewater treatment works in Villanueva de la Serena and Don Benito\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sando executes the sewerage and wastewater treatment project in Don Benito\" \/>\n<meta property=\"og:description\" content=\"Sando Construcci\u00f3n undertakes sanitation and wastewater treatment works in Villanueva de la Serena and Don Benito\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito\" \/>\n<meta property=\"og:site_name\" content=\"Sando\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-21T12:16:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-05-02T10:35:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1199\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ignacio Miranda\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ignacio Miranda\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito\"},\"author\":{\"name\":\"Ignacio Miranda\",\"@id\":\"https:\/\/www.sando.com\/en#\/schema\/person\/de9e7d8314e1c13302097b9d7abd6f62\"},\"headline\":\"Sando Construcci\u00f3n undertakes sanitation and wastewater treatment works in Villanueva de la Serena and Don Benito\",\"datePublished\":\"2025-03-21T12:16:24+00:00\",\"dateModified\":\"2025-05-02T10:35:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito\"},\"wordCount\":486,\"publisher\":{\"@id\":\"https:\/\/www.sando.com\/en#organization\"},\"image\":{\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-2.jpg\",\"keywords\":[\"edar\",\"efficiency\",\"hydraulics\",\"Infrastructure\",\"innovation\",\"Sustainability\",\"water\"],\"articleSection\":[\"Blog-EN\",\"Communication\",\"Uncategorised\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito\",\"url\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito\",\"name\":\"Sando executes the sewerage and wastewater treatment project in Don Benito\",\"isPartOf\":{\"@id\":\"https:\/\/www.sando.com\/en#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-2.jpg\",\"datePublished\":\"2025-03-21T12:16:24+00:00\",\"dateModified\":\"2025-05-02T10:35:53+00:00\",\"description\":\"Sando Construcci\u00f3n undertakes sanitation and wastewater treatment works in Villanueva de la Serena and Don Benito\",\"breadcrumb\":{\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito#primaryimage\",\"url\":\"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-2.jpg\",\"contentUrl\":\"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-2.jpg\",\"width\":1199,\"height\":800,\"caption\":\"https:\/\/www.chguadiana.es\/\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/www.sando.com\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sando Construcci\u00f3n undertakes sanitation and wastewater treatment works in Villanueva de la Serena and Don Benito\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.sando.com\/en#website\",\"url\":\"https:\/\/www.sando.com\/en\",\"name\":\"Sando\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.sando.com\/en#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.sando.com\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.sando.com\/en#organization\",\"name\":\"Sando\",\"url\":\"https:\/\/www.sando.com\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.sando.com\/en#\/schema\/logo\/image\/\",\"url\":\"\",\"contentUrl\":\"\",\"caption\":\"Sando\"},\"image\":{\"@id\":\"https:\/\/www.sando.com\/en#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.sando.com\/en#\/schema\/person\/de9e7d8314e1c13302097b9d7abd6f62\",\"name\":\"Ignacio Miranda\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.sando.com\/en#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/70b7487f1d3f0535f36d3ce7bc97e9729e4efb96033c2bb2f37aa99d6026879b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/70b7487f1d3f0535f36d3ce7bc97e9729e4efb96033c2bb2f37aa99d6026879b?s=96&d=mm&r=g\",\"caption\":\"Ignacio Miranda\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Sando executes the sewerage and wastewater treatment project in Don Benito","description":"Sando Construcci\u00f3n undertakes sanitation and wastewater treatment works in Villanueva de la Serena and Don Benito","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito","og_locale":"en_US","og_type":"article","og_title":"Sando executes the sewerage and wastewater treatment project in Don Benito","og_description":"Sando Construcci\u00f3n undertakes sanitation and wastewater treatment works in Villanueva de la Serena and Don Benito","og_url":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito","og_site_name":"Sando","article_published_time":"2025-03-21T12:16:24+00:00","article_modified_time":"2025-05-02T10:35:53+00:00","og_image":[{"width":1199,"height":800,"url":"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-2.jpg","type":"image\/jpeg"}],"author":"Ignacio Miranda","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Ignacio Miranda","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito#article","isPartOf":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito"},"author":{"name":"Ignacio Miranda","@id":"https:\/\/www.sando.com\/en#\/schema\/person\/de9e7d8314e1c13302097b9d7abd6f62"},"headline":"Sando Construcci\u00f3n undertakes sanitation and wastewater treatment works in Villanueva de la Serena and Don Benito","datePublished":"2025-03-21T12:16:24+00:00","dateModified":"2025-05-02T10:35:53+00:00","mainEntityOfPage":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito"},"wordCount":486,"publisher":{"@id":"https:\/\/www.sando.com\/en#organization"},"image":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito#primaryimage"},"thumbnailUrl":"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-2.jpg","keywords":["edar","efficiency","hydraulics","Infrastructure","innovation","Sustainability","water"],"articleSection":["Blog-EN","Communication","Uncategorised"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito","url":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito","name":"Sando executes the sewerage and wastewater treatment project in Don Benito","isPartOf":{"@id":"https:\/\/www.sando.com\/en#website"},"primaryImageOfPage":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito#primaryimage"},"image":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito#primaryimage"},"thumbnailUrl":"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-2.jpg","datePublished":"2025-03-21T12:16:24+00:00","dateModified":"2025-05-02T10:35:53+00:00","description":"Sando Construcci\u00f3n undertakes sanitation and wastewater treatment works in Villanueva de la Serena and Don Benito","breadcrumb":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito#primaryimage","url":"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-2.jpg","contentUrl":"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/EDAR-Don-Benito-V-Serena-2.jpg","width":1199,"height":800,"caption":"https:\/\/www.chguadiana.es\/"},{"@type":"BreadcrumbList","@id":"https:\/\/www.sando.com\/en\/actualidad\/sando-construccion-undertakes-sanitation-and-wastewater-treatment-works-in-villanueva-de-la-serena-and-don-benito#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.sando.com\/en"},{"@type":"ListItem","position":2,"name":"Sando Construcci\u00f3n undertakes sanitation and wastewater treatment works in Villanueva de la Serena and Don Benito"}]},{"@type":"WebSite","@id":"https:\/\/www.sando.com\/en#website","url":"https:\/\/www.sando.com\/en","name":"Sando","description":"","publisher":{"@id":"https:\/\/www.sando.com\/en#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.sando.com\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.sando.com\/en#organization","name":"Sando","url":"https:\/\/www.sando.com\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sando.com\/en#\/schema\/logo\/image\/","url":"","contentUrl":"","caption":"Sando"},"image":{"@id":"https:\/\/www.sando.com\/en#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.sando.com\/en#\/schema\/person\/de9e7d8314e1c13302097b9d7abd6f62","name":"Ignacio Miranda","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sando.com\/en#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/70b7487f1d3f0535f36d3ce7bc97e9729e4efb96033c2bb2f37aa99d6026879b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/70b7487f1d3f0535f36d3ce7bc97e9729e4efb96033c2bb2f37aa99d6026879b?s=96&d=mm&r=g","caption":"Ignacio Miranda"}}]}},"_links":{"self":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/posts\/49748","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/comments?post=49748"}],"version-history":[{"count":0,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/posts\/49748\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/media\/47934"}],"wp:attachment":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/media?parent=49748"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/categories?post=49748"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tags?post=49748"},{"taxonomy":"tax_brand","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tax_brand?post=49748"},{"taxonomy":"tax_services","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tax_services?post=49748"},{"taxonomy":"tax_location","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tax_location?post=49748"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}