{"id":49752,"date":"2025-03-17T13:11:45","date_gmt":"2025-03-17T13:11:45","guid":{"rendered":"https:\/\/www.sando.com\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network"},"modified":"2025-10-07T16:10:51","modified_gmt":"2025-10-07T16:10:51","slug":"the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network","status":"publish","type":"post","link":"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network","title":{"rendered":"The Rante Tunnel: A Benchmark in Sustainable Construction for Spain\u2019s High-Speed Rail Network"},"content":{"rendered":"\n<p>The construction of the Taboadela\u2013Rante Tunnel section of the High-Speed Rail line for <a href=\"https:\/\/www.adifaltavelocidad.es\/\" target=\"_blank\" rel=\"noreferrer noopener\">Adif Alta Velocidad<\/a> has become a flagship example of sustainable infrastructure for <a href=\"\/en\/sando-construccion\" title=\"Sando Construcci\u00f3n. Building resilient and innovative infrastructures\" target=\"_blank\">Sando Construcci\u00f3n<\/a>. The project, carried out by a joint venture led by Sando, has stood out for its strong focus on environmental management and <a href=\"\/en\/sustainability\" title=\"Sustainable and efficient environmental solutions\" target=\"_blank\">Sustainability<\/a> practices. <\/p>\n\n<p>It forms part of the wider works to integrate and enhance the urban <a href=\"\/en\/specialisations\/transport-infrastructure\/passenger-transport\/railway\" title=\"Construction of railroad tracks\" target=\"_blank\">Railway<\/a> network in Ourense. Innovative Tunnel Construction. The centrepiece of the project is the Rante Tunnel\u2014a dual-track single-tube tunnel with a free cross-section of 85 m\u00b2 and a length of 3,410 metres, built using the New Austrian Tunnelling Method (NATM). <\/p>\n\n<p>The site team adopted a resource-efficient approach aligned with circular economy principles, reducing raw material consumption and maximising <a href=\"https:\/\/www.sando.com\/en\/specialisations\/cleaning-and-waste-management\" title=\"Waste management\" target=\"_blank\">Waste<\/a> reuse. The joint venture was officially recognised as a Non-Hazardous Construction and Demolition Waste Recovery Company, with over 50% of excavated materials recovered for reuse. <\/p>\n\n<p>Excavated stone was repurposed to produce concrete for the project and to restore disused open-pit quarries, contributing to environmental recovery.<\/p>\n\n<p>These actions significantly reduced the occupation of natural habitats, minimised resource consumption and carbon footprint, and eliminated the need to transport half the excavated material to landfill. <\/p>\n\n<p>The project successfully met all six environmental goals of the EU Taxonomy\u2019s \u201cDo No Significant Harm\u201d (DNSH) principles, achieving an impressive 98% recovery rate of construction and demolition waste.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Efficient Water Resource Management<\/strong><\/h3>\n\n<p>Water management was another key achievement of the project. The type of explosive used in tunnelling was changed from ANFO (ammonium nitrate and fuel oil) to a gelatinous alternative (Goma-2), reducing ammonium levels in the water.  <\/p>\n\n<p>Three water treatment systems were installed at the tunnel portals and operated for 22 months to treat industrial wastewater from drilling activities. These systems significantly reduced suspended solids, ammonium, and other pollutants, allowing part of the treated water to be reused in drilling, dust suppression, and cleaning, thereby reducing water extraction needs.  <\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Biodiversity Conservation and Protection<\/strong><\/h3>\n\n<p>To safeguard sensitive ecosystems and wildlife, construction activities were restricted between March and July in compliance with environmental requirements, particularly to protect watercourses, riparian vegetation, and forested areas.<\/p>\n\n<p>A biologist specialising in ecosystem restoration was contracted to coordinate conservation efforts in collaboration with the Galician Regional Government\u2019s Natural Heritage Department <a href=\"https:\/\/patrimonionatural.xunta.gal\/es\" target=\"_blank\" rel=\"noreferrer noopener\">(Patrimonio Natural de la Xunta de Galicia)<\/a>. <\/p>\n\n<p>These actions prevented the occupation of over 86,000 m<sup>\u00b2<\/sup> of land earmarked for landfill, protecting habitats and minimising impact on native species such as the European pond turtle (<em>Emys orbicularis<\/em>).<\/p>\n\n<p>As part of its environmental management plan, Sando also trained subcontractors, raising awareness across all production levels about the importance of environmental protection.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Sando Awards Recognition<\/strong>, sustainable construction<\/h3>\n\n<p>The Taboadela\u2013Rante Tunnel project was honoured in the first edition of the Sando Awards, winning in the category for \u201cGreatest Contribution to <a href=\"https:\/\/www.sando.com\/en\/sustainability\" target=\"_blank\" rel=\"noreferrer noopener\">Sustainability <\/a>and Quality.\u201d The award recognises the dedication and commitment of the entire project team. <\/p>\n\n<p>In alignment with the <a href=\"https:\/\/www.sando.com\/en\/sustainability\/sdgs-sustainable-development-challenges\" target=\"_blank\" rel=\"noreferrer noopener\">Sustainable Development Goals<\/a> and the 2030 Agenda, Sando Construcci\u00f3n has contributed to SDG 9 (building resilient infrastructure, fostering sustainable industrialisation, and promoting innovation), SDG 15 (life on land), and SDGs 11, 12, and 13 through responsible resource use, circular economy integration, and carbon footprint reduction.<\/p>\n","protected":false},"excerpt":{"rendered":"The construction of the Taboadela\u2013Rante Tunnel section of the High-Speed Rail line for Adif Alta Velocidad has become a flagship example of sustainable infrastructure for Sando Construcci\u00f3n. The project, carried out by a joint venture led by Sando, has stood out for its strong focus on environmental management and Sustainability practices. It forms part of&#8230; <a class=\"view-article\" href=\"https:\/\/www.sando.com\/en\/reemplazos\/conacon-sando\">View Article<\/a>","protected":false},"author":6,"featured_media":47811,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[980,979,1523],"tags":[1818,1800,1833,1857,1509,1856,1850,1517,1858,1530],"tax_brand":[1765],"tax_services":[],"tax_location":[],"class_list":["post-49752","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-comunicacion-comunicacion-en","category-communication","category-corporate-social-responsibility","tag-economia-circular-en-2","tag-eficiencia-en-2","tag-esg-en-2","tag-high-speed","tag-infrastructure","tag-quality","tag-recycling","tag-social-responsibility","tag-tunnel","tag-water","tax_brand-sando-construccion-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Rante Tunnel, a Benchmark in Sustainable Construction in Sando<\/title>\n<meta name=\"description\" content=\"Adif Alta Velocidad&#039;s Taboadela-T\u00fanel de Rante High Speed section is a benchmark in sustainable construction in Sando\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Rante Tunnel, a Benchmark in Sustainable Construction in Sando\" \/>\n<meta property=\"og:description\" content=\"Adif Alta Velocidad&#039;s Taboadela-T\u00fanel de Rante High Speed section is a benchmark in sustainable construction in Sando\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network\" \/>\n<meta property=\"og:site_name\" content=\"Sando\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-17T13:11:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-07T16:10:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/tunel-de-rante-construccion-sostenible-sando-.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ignacio Miranda\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ignacio Miranda\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network\"},\"author\":{\"name\":\"Ignacio Miranda\",\"@id\":\"https:\/\/www.sando.com\/en#\/schema\/person\/de9e7d8314e1c13302097b9d7abd6f62\"},\"headline\":\"The Rante Tunnel: A Benchmark in Sustainable Construction for Spain\u2019s High-Speed Rail Network\",\"datePublished\":\"2025-03-17T13:11:45+00:00\",\"dateModified\":\"2025-10-07T16:10:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network\"},\"wordCount\":530,\"publisher\":{\"@id\":\"https:\/\/www.sando.com\/en#organization\"},\"image\":{\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/tunel-de-rante-construccion-sostenible-sando-.jpg\",\"keywords\":[\"circular economy\",\"efficiency\",\"esg\",\"high speed\",\"Infrastructure\",\"quality\",\"recycling\",\"Social Responsibility\",\"tunnel\",\"water\"],\"articleSection\":[\"Blog-EN\",\"Communication\",\"Corporate Social Responsibility\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network\",\"url\":\"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network\",\"name\":\"The Rante Tunnel, a Benchmark in Sustainable Construction in Sando\",\"isPartOf\":{\"@id\":\"https:\/\/www.sando.com\/en#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/tunel-de-rante-construccion-sostenible-sando-.jpg\",\"datePublished\":\"2025-03-17T13:11:45+00:00\",\"dateModified\":\"2025-10-07T16:10:51+00:00\",\"description\":\"Adif Alta Velocidad's Taboadela-T\u00fanel de Rante High Speed section is a benchmark in sustainable construction in Sando\",\"breadcrumb\":{\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network#primaryimage\",\"url\":\"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/tunel-de-rante-construccion-sostenible-sando-.jpg\",\"contentUrl\":\"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/tunel-de-rante-construccion-sostenible-sando-.jpg\",\"width\":1200,\"height\":800,\"caption\":\"La ejecuci\u00f3n del tramo de Alta Velocidad Taboadela-T\u00fanel de Rante para Adif Alta Velocidad se ha convertido en un referente en construcci\u00f3n sostenible para la compa\u00f1\u00eda. Las actuaciones que han desarrollado los t\u00e9cnicos de Sando Construcci\u00f3n en UTE destacan en clave de gesti\u00f3n ambiental y sostenibilidad.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/www.sando.com\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Rante Tunnel: A Benchmark in Sustainable Construction for Spain\u2019s High-Speed Rail Network\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.sando.com\/en#website\",\"url\":\"https:\/\/www.sando.com\/en\",\"name\":\"Sando\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.sando.com\/en#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.sando.com\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.sando.com\/en#organization\",\"name\":\"Sando\",\"url\":\"https:\/\/www.sando.com\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.sando.com\/en#\/schema\/logo\/image\/\",\"url\":\"\",\"contentUrl\":\"\",\"caption\":\"Sando\"},\"image\":{\"@id\":\"https:\/\/www.sando.com\/en#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.sando.com\/en#\/schema\/person\/de9e7d8314e1c13302097b9d7abd6f62\",\"name\":\"Ignacio Miranda\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.sando.com\/en#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/70b7487f1d3f0535f36d3ce7bc97e9729e4efb96033c2bb2f37aa99d6026879b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/70b7487f1d3f0535f36d3ce7bc97e9729e4efb96033c2bb2f37aa99d6026879b?s=96&d=mm&r=g\",\"caption\":\"Ignacio Miranda\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Rante Tunnel, a Benchmark in Sustainable Construction in Sando","description":"Adif Alta Velocidad's Taboadela-T\u00fanel de Rante High Speed section is a benchmark in sustainable construction in Sando","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network","og_locale":"en_US","og_type":"article","og_title":"The Rante Tunnel, a Benchmark in Sustainable Construction in Sando","og_description":"Adif Alta Velocidad's Taboadela-T\u00fanel de Rante High Speed section is a benchmark in sustainable construction in Sando","og_url":"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network","og_site_name":"Sando","article_published_time":"2025-03-17T13:11:45+00:00","article_modified_time":"2025-10-07T16:10:51+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/tunel-de-rante-construccion-sostenible-sando-.jpg","type":"image\/jpeg"}],"author":"Ignacio Miranda","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Ignacio Miranda","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network#article","isPartOf":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network"},"author":{"name":"Ignacio Miranda","@id":"https:\/\/www.sando.com\/en#\/schema\/person\/de9e7d8314e1c13302097b9d7abd6f62"},"headline":"The Rante Tunnel: A Benchmark in Sustainable Construction for Spain\u2019s High-Speed Rail Network","datePublished":"2025-03-17T13:11:45+00:00","dateModified":"2025-10-07T16:10:51+00:00","mainEntityOfPage":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network"},"wordCount":530,"publisher":{"@id":"https:\/\/www.sando.com\/en#organization"},"image":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network#primaryimage"},"thumbnailUrl":"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/tunel-de-rante-construccion-sostenible-sando-.jpg","keywords":["circular economy","efficiency","esg","high speed","Infrastructure","quality","recycling","Social Responsibility","tunnel","water"],"articleSection":["Blog-EN","Communication","Corporate Social Responsibility"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network","url":"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network","name":"The Rante Tunnel, a Benchmark in Sustainable Construction in Sando","isPartOf":{"@id":"https:\/\/www.sando.com\/en#website"},"primaryImageOfPage":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network#primaryimage"},"image":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network#primaryimage"},"thumbnailUrl":"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/tunel-de-rante-construccion-sostenible-sando-.jpg","datePublished":"2025-03-17T13:11:45+00:00","dateModified":"2025-10-07T16:10:51+00:00","description":"Adif Alta Velocidad's Taboadela-T\u00fanel de Rante High Speed section is a benchmark in sustainable construction in Sando","breadcrumb":{"@id":"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network#primaryimage","url":"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/tunel-de-rante-construccion-sostenible-sando-.jpg","contentUrl":"https:\/\/www.sando.com\/contenido\/subidas\/2025\/03\/tunel-de-rante-construccion-sostenible-sando-.jpg","width":1200,"height":800,"caption":"La ejecuci\u00f3n del tramo de Alta Velocidad Taboadela-T\u00fanel de Rante para Adif Alta Velocidad se ha convertido en un referente en construcci\u00f3n sostenible para la compa\u00f1\u00eda. Las actuaciones que han desarrollado los t\u00e9cnicos de Sando Construcci\u00f3n en UTE destacan en clave de gesti\u00f3n ambiental y sostenibilidad."},{"@type":"BreadcrumbList","@id":"https:\/\/www.sando.com\/en\/actualidad\/the-rante-tunnel-a-benchmark-in-sustainable-construction-for-spains-high-speed-rail-network#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.sando.com\/en"},{"@type":"ListItem","position":2,"name":"The Rante Tunnel: A Benchmark in Sustainable Construction for Spain\u2019s High-Speed Rail Network"}]},{"@type":"WebSite","@id":"https:\/\/www.sando.com\/en#website","url":"https:\/\/www.sando.com\/en","name":"Sando","description":"","publisher":{"@id":"https:\/\/www.sando.com\/en#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.sando.com\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.sando.com\/en#organization","name":"Sando","url":"https:\/\/www.sando.com\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sando.com\/en#\/schema\/logo\/image\/","url":"","contentUrl":"","caption":"Sando"},"image":{"@id":"https:\/\/www.sando.com\/en#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.sando.com\/en#\/schema\/person\/de9e7d8314e1c13302097b9d7abd6f62","name":"Ignacio Miranda","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sando.com\/en#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/70b7487f1d3f0535f36d3ce7bc97e9729e4efb96033c2bb2f37aa99d6026879b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/70b7487f1d3f0535f36d3ce7bc97e9729e4efb96033c2bb2f37aa99d6026879b?s=96&d=mm&r=g","caption":"Ignacio Miranda"}}]}},"_links":{"self":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/posts\/49752","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/comments?post=49752"}],"version-history":[{"count":0,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/posts\/49752\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/media\/47811"}],"wp:attachment":[{"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/media?parent=49752"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/categories?post=49752"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tags?post=49752"},{"taxonomy":"tax_brand","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tax_brand?post=49752"},{"taxonomy":"tax_services","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tax_services?post=49752"},{"taxonomy":"tax_location","embeddable":true,"href":"https:\/\/www.sando.com\/en\/wp-json\/wp\/v2\/tax_location?post=49752"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}