Transport and mobility
 
 Adequacy of the tunnels of La Cerradura, Despeñaperros, Cantera, La Miel and Santa Lucía
 
 Rehabilitation of the TF-335 road
 
 Replacement of wearing course on road A-497
 
 Metro Madrid depot
 
 Sants Station
 
 Road surface rehabilitation on the TF-627 island road
 
 Rehabilitation of the road surface of the Via de Penetración on the TF-4 motorway
 
 Rehabilitation of the road surface of the TF-1 road of interest
 
 Road surface reinforcement on the A-44 road
 
 Installation of safety barriers and motorcyclist protection
 
 Adequacy of the tunnels of La Cerradura, Despeñaperros, Cantera, La Miel and Santa Lucía
 
 Subway for handling vehicles at Malaga Airport
 
 AVE Colmenar Viejo-Soto del Real
 
 Sorbas-Barranco de los Gafarillos High Speed Train
 
 AVE Siete Aguas-Buñol
 
 La Canda Tunnel
 
 Tunnels for emergency exits at Sants-Sagrera Station
 
 Remodelling of the new access ramp from TF-24
 
 Laying of dual carriageway for access to Sanlúcar de Barrameda from Chipiona
 
 Construction of the accesses to Tazo and Argumul in La Gomera
 
 Road maintenance and conservation of the island roads of La Gomera
 
 Conservation of the A-4 motorway
 
 Road maintenance in the South of Tenerife
 
 Road maintenance in the north-eastern area of Granada