Debugging

Purification is cleaning wastewater from materials, biological residues, metals and chemicals. Treating wastewater from domestic and industrial uses treats and removes pollutants before it is returned to a receiving watercourse or reused for industrial or irrigation purposes.

Precisely, wastewater treatment consists of the removal of suspended solids and materials in wastewater, the removal of dissolved chemical and biological pollutants in wastewater and eventually, the removal of nutrients such as nitrogen and/or phosphorus that cause water eutrophication, leading to uncontrolled proliferation of phytoplanktonic algae.

Reclaim wastewater and reintroduce it back into the cycle for reuse.

This sanitation and purification treatment is carried out in several stages in wastewater treatment plants. In the water line, they stand out:

  • Pre-treatment, by which coarse materials and solids present in the water are removed by screening and sieving. This separates these materials and prevents solids and large objects from damaging downstream treatment equipment.
  • Primary treatment for removing all settleable solids and floating materials through a sedimentation process in which the wastewater is left to settle, allowing the solids to settle to the bottom of the tank and the floating materials to be removed from the surface. They may be complemented by chemical treatments for extracting a particular pollutant.
  • Secondary treatment,which allows the removal of organic pollutants and dissolved nutrients by using aerobic or anaerobic bacteria in biological processes such as oxidation and digestion through physicochemical processes such as coagulation, flocculation and filtration. Another process used is Disinfection,, the final step, a procedure that eliminates pathogenic micro-organisms through exposure to disinfectant chemicals such as chlorine, ozone or UV light.

Among the actions carried out, it is worth highlighting the work at the Peñón del Cuervo WWTP and the Rincón de la Victoria WWTP to direct regenerated water to agricultural estates. Both connections increase farm water resources and add up to 9.1 cubic hectometres of reclaimed water for irrigation in La Axarquía.

As well as the design and construction of the Malaga Norte WWTP, the largest wastewater treatment plant in Malaga, and the Don Benito y Villafranca, Tajuña, Estepona and Ecija WWTPs, among many others. From the point of view of the maintenance and operation of WWTPs, for example, the El Copero WWTP, the largest in Seville, and the Ranilla WWTP in the same province have been preserved.

depuracion edar copero

debugging

Green innovation against water scarcity

we tell you more
Water Management

We close the circle of water management by using techniques and technology to clean wastewater and reintroduce it into the cycle to be used again.

At Sando Agua, we perform sanitation actions to eliminate both suspended and chemical or biological materials in wastewater. To do this, we use specialised techniques that make it possible to obtain water that can be reused in other processes and to protect ecosystems from harmful elements present in the water that can cause negative impacts on species.

related projects

Our experience in Debugging

Sando Construcción se encarga de los trabajos de rehabilitación del edificio integral del pabellón 12 del Instituto de Salud Carlos III.
Sustainable building

Refurbishment of Pavilion 12 of the Carlos III Health Institute

Madrid (Community of Madrid)
Sando construye el nuevo edificio que actúa como ampliación del Museo Arqueológico Regional de la Comunidad de Madrid, en Alcalá de Henares.
Construction and refurbishment of offices

Alcalá de Henares Archaeological Museum

Madrid (Community of Madrid)
Sando Construcción construye el Intercambiador de Transportes de Ciudad Expo en el complejo Aljarafe Center en Sevilla.
Construction and refurbishment of offices

Aljarafe Central Complex

Seville (Andalusia)
El mantenimiento de viales en l bahía de Algeciras abarca distintas actuaciones en los puertos de la Autoridad Portuaria.
Urban conservation and smart cities

Maintenance of roads in the Bay of Algeciras

Algeciras (Andalusia)
Sando Construcción realiza la reforma y ampliación del Hospital de Día Onco-Hematológico del Hospital Virgen de la Victoria de Málaga.
Sustainable building

Hospital Virgen de la Victoria

Cártama (Andalusia)
Hospital Quirón Marbella
Sustainable building

Hospital de Quirónsalud en Marbella

Marbella (Andalusia)
Conacon Sando se encarga del mantenimiento del viario de Bormujos en Sevilla, con acciones para la mejora de la accesibilidad.
Urban conservation and smart cities

Bormujos Road Maintenance

Seville (Andalusia)
Rehabilitación del edificio del Consorcio de Compensación de Seguros, situado en el Paseo de la Castellana 44 Madrid.
Sustainable building

Consorcio Seguros Building Castellana 44

Madrid (Community of Madrid)
Sando Construcción ejecuta las nuevas instalaciones logísticas de Mayoral Moda Infantil en el polígono industrial Intelhorce, en Málaga.
Sustainable building

Mayoral’s logistics facilities in Malaga

Cártama (Andalusia)
Edificio Velázquez
Construction and refurbishment of offices

Velázquez Building

Madrid (Community of Madrid)

News Services

El grupo de empresas Sando ha llevado a cabo un proceso de renovación de la identidad corporativa de sus principales marcas con el objetivo de actualizar sus denominaciones y reforzar su posicionamiento en los ámbitos de las infraestructuras y los servicios.

Sando redefine su arquitectura de marca y refuerza su posicionamiento en infraestructuras y servicios

Sando Conservación y Energía interviene en la desinfección del Puerto de Granadilla tras la evacuación del buque MV Hondius por hantavirus

Sando Conservación y Energía intervenes in the disinfection of the Port of Granadilla after the evacuation of the MV Hondius vessel

Sando Infraestructuras y Proyectos y Sando Conservación y Energía han superado las auditorías de seguimiento realizadas por la entidad AENOR conforme a la norma internacional ISO 19650 (partes 1 y 2). Esta certificación acredita la correcta gestión de la información en proyectos desarrollados con metodología BIM en la compañía.

Sando passes the AENOR audit for BIM certification in accordance with ISO 19650

Sando Conservación y Energía lidera el proyecto SOTER, una innovadora iniciativa de I+D+i orientada al desarrollo de un sistema avanzado para la inspección automatizada del estado de los pavimentos, basado en el uso de imágenes de satélite de muy alta resolución e inteligencia artificial que permite desarrollar un mantenimiento preventivo en grandes superficies.

Sando applies satellite imagery and AI in SOTER innovation project to improve road maintenance

Conacon Sando ejecuta la primera calle 100% sostenible de las Islas Canarias, bajo encargo del Ayuntamiento de Santa Cruz de Tenerife.

A 100% sustainable street, Conacon Sando’s new project in Tenerife

Se ha inaugurado el nuevo tramo del Corredor Verde construido por Sando en Pizarra. Un proyecto para la recuperación del río Guadalhorce.

Inauguration of the Green Corridor between Pizarra and La Vega Hipólito

Althenia, solutions for decarbonization and CO2 neutralization

Althenia Sando completes the coastal path on Cristo Beach in Estepona

specialized brands

Guaranteed success in Debugging

Sando Water